Snow Protection
26-07-2002A temporary barrier is constructed by the chief engineer Jaap Groot to relief the snow pressure at the back of the stelae on the West Terrace.
A temporary barrier is constructed by the chief engineer Jaap Groot to relief the snow pressure at the back of the stelae on the West Terrace.